바로가기 메뉴
본문 바로가기
주메뉴 바로가기
See implemeted document only Establishment of the “Guidelines for Onboard CO₂ Injection Facilities”
Date : 2026-11-20 View : 203

This is related to the “Procedure for Development of Classification Technical Rules (QP-08)" 6.2 and "Instruction for Control of Internal Survey Guidelines, Circular and Technical Information(QI-03)" 5.5.

 

- These Guidelines apply to gas carriers equipped with facilities for the direct injection of CO₂ into subsea geological storage formations. They address risk assessment, arrangement and design, safety systems, and operation and maintenance to ensure the safe design and operation of such facilities

- Person in charge : Machinery Rule Development Team/ KIM Heetag
                      

※ Attachment : Guidelines for Onboard CO₂ Injection Facilities (K/E) - 1 copy (The End)

 

                                 General Manager of Machinery Rule Development Team