海工平台工程
Over the past two decades, we have undertaken a number of structural integrity assessments for ship and plant systems by working closely with the world’s major shipyards and related maritime organizations.
A structural integrity assessment determines whether a structure meets the relevant rules and standards through numerical calculation of its stiffness, stress distribution and deformation induced by internal and external pressures such as hull weight, outfitting, cargo weight, wind, current and wave motion.
We perform research work on behalf of shipyards for a range of offshore structures including jack-ups, drilling rigs, FPSOs, FPUs and FSOs.
  • MOHO FPU ProjectOwner : Total (2005 - 2007)
  • USAN FPSO ProjectOwner : Total (2008 - 2009)
  • CLOV FPSO ProjectOwner : Total (2010 - 2011))
  • BP Q204 FPSO Project Owner : BP (2011 - 2012)
  • ICHTHYS FPSO Project Owner : INPEX (2012 -)
  • Drilling Rig Life Enhancement Project Owner : KNOC (2011 - 2012)
  • Jack-up Rig project (2010 - 2011)
    • 2015 - 2016. PETRONAS BARONIA(BNCPP-B) PROJECT
      • ①CFD analysis, structural fire redundancy analysis, PFP design and optimization study
    • 2014 - 2015. DONG HEJRE TOPSIDE
      • ①Design & structural strength analysis, Design of stair towers
    • 2014 - 2015. STATOIL GINA KROG TOPSIDE
      • ①Design of Escape tunnel, Interface connection design between tunnel sections, Local joint design
    • 2014 - 2016. ENI JANGKRIK FPU/HHI
      • ①main hull strength analysis, appurtenance strength analysis
    • 2013 - 2016. TOTAL NORD FPU/HSHI&HHI
      • ①main hull strength analysis/spectral fatigue analysis, appurtenance strength analysis/spectral fatigue analysis, accidental analysis (collision, drop object, explosion)
    • 2012 - 2013. IPEX ICHTHYS FPSO/DSME
      • ①main hull strength analysis, appurtenance strength analysis, accidental analysis
    • 2011 - 2012. BP Q204/HHI
      • ①main hull strength analysis/spectral fatigue analysis, appurtenance strength analysis/spectral fatigue analysis, accidental analysis (collision, drop object, explosion)
    • 2011 - 2012. KNOC Semi-submersible drilling unit
      • ①Ship condition assessment and life enhancement
    • 2010 - 2011. TOTAL CLOV FPSO/DSME
      • ①main hull strength analysis, appurtenance strength analysis
    • 2010 - 2011. SAAF Rosemond Jack-up Drilling Rig
      • ①Design review & DSA, Plan approval, in-place analysis, transit analysis, fatigue analysis
    • 2008 - 2009. TOTAL USAN FPSO/HHI
      • ①main hull strength analysis, accidental analysis (collision, drop object, explosion)