바로가기 메뉴
본문 바로가기
주메뉴 바로가기
[2024-IMO-07] Procedural manual for override and use of power reserve on ships installed with SHaPoLi/EPL (Rev.2).
17 Jul. 2024

In accordance with the implementation of EEXI requirement, ships subject to the requirement are installed with the Power Limitation System (SHaPoLi/EPL) until the first periodical IAPP survey on or after January 1st 2023.


Please refer to the procedural manual for matters related to the activation of override, use of a power reserve and reactivation of EPL/SHaPoLi.

This technical information revokes the previous technical information 2023-IMO-07 and 2024-IMO-01