바로가기 메뉴
본문 바로가기
주메뉴 바로가기
[2024-IMO-01] Procedural Manual for Override and Use of Power Reserve on Ships Installed with SHaPoLi/EPL (Rev.1)
25 Mar. 2024

In accordance with the implementation of the EEXI requirement, ships subject to the requirement are installed with the Power Limitation System (SHaPoLi/EPL) until the first periodical IAPP survey on or after 1 January 2024.

 

Please refer to the procedural manual for matters related to the activation of override, use of a power reserve and reactivation of EPL/SHaPoLi.

 

This technical information revokes the previous technical information 2023-IMO-07